APP

ProjetWhitemud Industrial Park
Numéro du projetCommercial Industrial Buildings
Adresse50335 28 st.
Surintendant du siteHassan Prevaiz
Entrepreneur généralModern General Contractor's
4771 Eleniak Road Edmonton Alberta T6B 2N1 Can
Ingénieur de projetPhillip T. Tungul
10335 178 St. Edmonton Alberta T5S 1S2 Can
Commentaires

Commercial structures under construction.

Canada Steel Works Ltd. is certified to CSA Standard W47.1 “APP of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteHassan Prevaiz
Représentant de la CWBDarrell Draves
Date2025-03-13